Thai-Online | Date: Tuesday, 28.08.2018, 09:38 | Message # 1 |
Evil admin
Group: Admin
Messages: 1975
Reputation: 32767
Status: Online
| The installation of a pedestrian bridge over Sukhumvit in the area of Central Street will require a temporary closure of the tunnel passage. From 2 to 6 September, the 19 clock will overlap for the passage of the south side of the trunk tunnel. For traffic, it is proposed to use the roadway on the surface of Sukhumvit. September 3 from morning 8 to 16 hours will be closed to the north direction of the tunnel, while the road on the surface will remain open. 6 September, both sides of the tunnel will be closed for driving from 20 hours to midnight, the land section of the road will be closed from 22 hours to midnight. The exit from the 7 highway towards Central Pattaya will be closed. Motorists can turn right onto the Northern Road or make a U-turn and drive along the road along the railway in the direction of Sattahip. The northern direction of Sukhumvita will be closed from the Index Living Mall to the Siam Country Club. The final point of the completion of the project of the tunnel in Pattaya will be the installation of a pedestrian bridge for wheelchairs. An 400-ton crane mounted on a transport island will lift an 80-ton assembly into the 43-meter-long support. The bridge for people with disabilities will be equipped with elevators. The opening of the pedestrian bridge is expected at the end of 2018 of the year.Source
|
|
| |